HOME > COMPANY> TECHNICAL INFO

 

 






1. 910x910 m/m
2. 600x1200 m/m
3. 1200x1200 m/m
4. 1000x1000 m/m
5. 910x450 m/m


Free size as you want.


1. Have artforms fabricated and fixed pattern by pattern along a line over main
plywood of construction form by nailing.

2. Spray form oil over art form(EPS form) using a sprayor or brush
(No form oil needed for ABS form)

3. Artforms can be fixed either to the plywood prior to build constrution form or to
the builtconstruction form. however in latter case, fixing work should be done
before steel bar fabrication and constructionform building work.

4. If the artforms needed to cut for building and fabrication of construction
form, a sharp knife cutting is applicable

5. Be careful to keepart forms assembled or fabricated in a desired order of
pattern by pattern, or a reversed patterns carved.


1. Aggregate size 25m/m and slump 12cm is recommendable when
art form applied.

2. Artforms are designed and produced to keep enough strength over
the pressure of concrete pouring.however, concrete pouring work should be to
avoid pattern demage of art form.

3. Please keep the surface of art form in safe from demages while steel bar work.
and vibrator should be placed in the mid of concrete poured to keep
art form from demages while vibrating work.

 

 

< artform setting >
 

< form-oil coating>
 

< tear off artform >
 

< drain board setting>
 

< after construction >
 
 

 


< steel form setting >
 

< urethane artform setting >

 


< system form setting >
 

< after construction >
 

< after construction >
 

< system form setting>
 

< after construction >
 







 
 

 